|
Technical Reports:
Feasibility Study Summary Report By: William Yeo, MAusIMM; John Wyche, MAusIMM, MMICA, CPEng; Michael Holmes, MSAIMM, PEng; Eric Norton, PEng; Don Hunter, FAusIMM, MIOM3, CPEng, CEng; Tim Ross, CPEng; Scott Britton, PEng; Grant Bosworth, PEng July 11, 2007
Click here to read this report
An Updated Preliminary Assessment of El Boleo Copper Cobalt Project By: William Yeo, MAusIMM; John Wyche, MAusIMM, MMICA, CPEng; Michael Holmes, MSAIMM, PEng; Eric Norton, PEng; Don Hunter, FAusIMM, MIOM3, CPEng, CEng; Tim Ross, CPEng; Scott Britton, PEng January 31, 2007
Click here to read this report
The Recovery of Copper, Cobalt, Zinc and Manganese Values from the Boleo Deposit; A Report on the Integrated Pilot Plant By: David Dreisinger et al, in conjunction with Bateman Engineering and SGS Lakefield Research Presented at XIII Encuentro sobre procesamiento de minerales, San Luis Potasi, Mexico October 11, 2006
Click here to read this report
New Developments in the Boleo Copper-Cobalt-Zinc-Manganese Project By:David Dreisinger et al, in conjunction with Bateman Engineering and SGS Lakefield Research May 2006
Click here to read this report
Independent Technical Report on the El Boleo Copper-Cobalt Project
By: Don Hunter, FAusIMM, C.P. (Mining), Brisbane, Australia
The Metallurgical Development of the El Boleo Copper-Cobalt-Zinc Project By: David Dreisinger, PhD, in conjunction with Bateman Engineering and SGS Lakefield Research May 2005
Click here to read this report
El Boleo Resource Estimate Study Report Hellman & Schofield Pty. Ltd. By:William Yeo, MAusIMM; and Phil Hellman, FAIG March 2005
Click here to read this report
|